Sunday, August 29, 2010

Week I Lost Count

Not sure what day or week it is but here is the latest progress. I had a first yesterday. I fell asleep in my dinner.


Furnace vent thing that Eric is proud of. It really sucks and blows. (eric made me write that).

More furnace pipes that Eric rerouted so my lower ceiling wouldn't be sooo ugly.


Ripped out the lower level hanging ceiling. Looks sooo much better. Those lights will be gone soon. Eric is renting a paint sprayer on Friday to paint the ceiling and pipes white so it will look very airy.

Yellow walls are gone!! Sharon and Simon helped prime and tape this weekend. OK, we need a vote here. Picture molding yah or neh. It currently dies into the newly framed walls rather than wrapping around. This is the ONLY room where this molding occurs. I said get rid of it, Eric wants to keep it.


Looking at the future dining room where there will be a railing.


The countertops are in!! Sort of. The sink is under there somewhere and the surface needs to be applied.

Appliances!!! Eric has been hard at work correcting the counter depth problem in the kitchen and inserting the slide in range. Note the VERY nice open shelving unit that will be above the future refrigerator to the right of the range.


And in other news....we hauled a trailer's worth of lawn debris away and are still working on ripping out the landscaping. It is a jungle.



No comments: